\part{Daily News for the Operator}
-\textbf{2022/02/06 - this page will be updated during the beamtime}
+\textbf{2022/02/12 - this page will be updated during the beamtime}
\begin{itemize*}
\item Always keep an eye on the rate plots (``Main Screen 4'' on the web page). If you notice any
asymmetry between sectors / parts of detectors, try to do a reload of thresholds for the detector
\item e.g. in TOF one sector has a lower/higher rate (-> Tresholds TOF)
\item e.g. in STS a group of 8 blue channels appear (-> Reset STS Thresholds)
\end{itemize*}
-
- \item Every 1 to 2 hours, when you do a DAQ restart, please do a ``Start Stop Trigger'', ``Reboot
-DiRich'' and a ``Reboot ECal'' before.
+Special attention is needed after a power cycle!
\item After any of the ``Reboot Hubs`` and DAQ restart: If Eventbuilders do not work, do
a ''Fix missing IP`` and another DAQ restart.
-% \item There is a ''Trigger`` error every now and then, from a board in RICH (70a7), which also
-% causes some ''Evt w/ errors``. This is a known, but no real issue and can be ignored.
+ \item In most cases a reboot of a subsystem is the better option compared to a power cycle. If
+all boards of a subsystem are present, do a reboot, but not a power cycle.
+
+
+ \item There are a couple of recent issues with MDC DAQ, where power cycles or reboots are not
+necessary:
+\begin{itemize*}
+\item If 9 boards including 1033 are missing: Do DAQ restarts until they are back.
+\item If 2110 and 2112 are missing after a DAQ restart: Restart again.
+\end{itemize*}
- \item After any power cycle, pay attention to the rate display from the subsystems. Especially
-ECal and STS likely need some manual action to get proper settings for all front-ends again (see
-first point in this list).
-
+\item If you do a reboot of DiRich and Combiners at once: Make a short pause after rebooting
+DiRich, and check there are less than 900 boards missing from RICH. If it's more, do a DAQ restart
+before rebooting Combiners.
\end{itemize*}
\clearpage