]> jspc29.x-matter.uni-frankfurt.de Git - daqdocu.git/commitdiff
some further adjustments after merge
authorJörn Adamczewski-Musch <j.adamczewski@gsi.de>
Wed, 20 Feb 2019 12:23:51 +0000 (13:23 +0100)
committerJörn Adamczewski-Musch <j.adamczewski@gsi.de>
Wed, 20 Feb 2019 12:23:51 +0000 (13:23 +0100)
hadesoperator/daqcontrol.tex

index 9252391d45ad8a9c905c3c97349f72530343a4ca..6ede4d6c852780b6ce30b05b7373d1885dc9d1bd 100644 (file)
@@ -30,7 +30,6 @@
 
 \subsection{Eventbuilder Tools}
 \begin{description}
-<<<<<<< HEAD
  \item[StartTDC CAL] Start calibration run for the trb3 TDCs. This will disable the regular CTS trigger inputs and send special calibration events with a 500 Hz pulser. 
  At the same time, the eventbuilders will record files of prefix ''TC''.
   \item[Stop TDC CAL] Stop the calibration run for trb3 TDCs that was started with the above button. This button has to be pressed when all DAQ input subsystems as shown 
    Change only on request. E.g. 1 EB for cosmics, 8 or 12 EB for beam data.
  
  \end{description}
-=======
- \item[Start TDC CAL] Start process of TDC calibration
- \item[Stop TDC CAL] Stops the TDC calibration, returns to normal data taking
- \item[BEAM Files] Start to write "be" beam files
- \item[COSMICS Files] Start to write "co" cosmics files
- \item[TEST file] Start to write "te" test files without important data
- \item[NO file] Leave eventbuilder running, but don't write data to disk
- \item[Restart EB] Start eventbuilders again (with new settings or after stop / failure)
- \item[Stop EB] Stop eventbuilders (not actually needed, select "NO file" instead)
- \item[Set N EB] Sets the number of running instances of eventbuilders. Change only on request. E.g. 1 Builder for cosmics, 6/8 for beam data.
-\end{description}
->>>>>>> 3b2a03d2619e1b12a39f0716a97d1f584112e0af
 
 \subsection{Expert Tools}
 {\it This section is visible only when the ''Show Expert Tools'' box on the upper left corner is checked. 
@@ -72,11 +59,7 @@ It contains actions which are not necessary for regular DAQ operation.}
  \item[BLR Reload Settings]
  \item[CTS Scope]
  \item[MDC LV Turn On All Relais]
-<<<<<<< HEAD
- \item[Reload RICH]
-=======
  \item[Relaod RICH]
->>>>>>> 3b2a03d2619e1b12a39f0716a97d1f584112e0af
  \item[Reload RPC Thresholds]
  \item[Restart BNET Control] Restart the DABC master process on lxhadeb07 that controls the building network (BNET).
   This process also delivers the eventbuilder monitoring at  \url{https://hades33/eb}
@@ -89,7 +72,6 @@ It contains actions which are not necessary for regular DAQ operation.}
  \item[Stop Speech Output]
 \end{description}
 
-<<<<<<< HEAD
 
 \subsection{Power Tools}
 This section offers buttons to cycle the low voltage supplies of several detector systems. These are convenience
@@ -113,19 +95,3 @@ clicking these buttons in the DAQ-Operator section!}
 
 
 \end{description}
-=======
-\subsection{Power Tools}
-\begin{description}
- \item[Powercycle all]
- \item[RICH Powercycle]
- \item[RICH Fan Powercycle] Switches RICH fans on/off
- \item[ECal 5V Entrance Powercycle]
- \item[ECal LV5 Powercycle]
- \item[Wall Powercycle]
- \item[Start Powercycle]
- \item[Hubs Powercycle]
- \item[MDC LV Powercycle]
- \item[RPC special PwrCyc]
-\end{description}
->>>>>>> 3b2a03d2619e1b12a39f0716a97d1f584112e0af