\item[FrpcRate] fRPC rate on all channels
\item[FrpcRateHist] fRPC rate on all modules over time
\item[GbeRate] Amount of data on each Ethernet link
- \item[HodoPosition]
- \item[HodoRate]
- \item[HodoRatePlot]
- \item[HodoRateX\_0]
- \item[HodoRateY\_0]
- \item[HodoSpillShapeAnalysisX\_0]
- \item[HodoSpillShapeAnalysisY\_0]
- \item[ItofRate]
- \item[ItofRateNumbers]
+ \item[HodoPosition] Position of the beam on the hodoscope
+ \item[HodoRate] Rate on all channels of the Hodoscope
+ \item[HodoRatePlot] Rate on all channels of the Hodoscope
+ \item[HodoRate*\_0] Rate on all channels of the Hodoscope
+ \item[HodoSpillShapeAnalysis*\_0] Spill structure from Hodoscope
+ \item[ItofRate] Rate of all TDC channels in iTOF
+ \item[ItofRateNumbers] Rate from all paddles of iTOF
\item[MDCBusy] Time of busyness of each MDC front-end motherboard (MBO).
\item[MDCFailure] Front-end Errors recieved by DAQ.
\item[MDCHV] Current HV \& ionisation current measurement of field \& cathode wire layers inside each of 24 drift-chambers.
\item[MdcPressurePlane4] Trend plot of overpressure inside each of 6 Plane 4 drift-chambers.
\item[MdcScales] Trend plot of the air temperature inside the cave
\item[MicroSpillStructure] The beam intensity in 20us bins, from Start detector
- \item[Muxhist]
- \item[Pt3AcceptRatio]
+ \item[Muxhist] Rates from two monitoring channels in the CTS
+ \item[Pt3AcceptRatio] Ratio of provided triggers to accepted triggers for main PT3 trigger
\item[QA] Main tactictal overview
\item[RichGas] Plots showing the gas sensors of the RICH
- \item[RichHV]
+ \item[RichHV] RICH HV settings
\item[RichInnerTemp] Display of the temperature sensors attached to the spokes inside the RICH detector
\item[RichMagnet] Display of the magnetic field sensors attached to the spokes inside the RICH detector
\item[RichRate] RICH rate per channel (ordered by DiRICH-Nr.)
\item[RichRatev2] Two dimensional display of the RICH rate
- \item[RichTempHistoDiRICH]
+ \item[RichTempHistoDiRICH] Temperature history of sensors in the RICH
\item[RichThresh] Two dimensional display of the DiRICH threshold settings
- \item[RpcRate]
+ \item[RpcRate] Rate on all TDC channels of RPC
\item[RpcTofRate] Rates of RPC and TOF combined
\item[RpcTofSectorRate] Rates of RPC and TOF combined
- \item[SpillInfoHodoX\_0]
-% \item[SpillInfoStart]
-% \item[SpillShapeAnalysisX]
-% \item[SpillShapeAnalysisY]
- \item[SpillStructure]
+ \item[SpillInfoHodoX\_0] Spill structure measured in Hodo
\item[StartCountSpill] Start counts per spill
- \item[StartPosition]
- \item[StartPositionRMS]
-% \item[StartPosition\_VW]
- \item[StartRateNumbers]
-% \item[StartRateNumbers\_VW]
- \item[StartRateSimple]
-% \item[StartRateSimple\_VW]
-% \item[StartRateX]
- \item[StartRateXhistbar]
-% \item[StartRateY]
- \item[StartRateYhistbar]
- \item[StartSpillShapeAnalysisX\_0]
- \item[StartSpillShapeAnalysisY\_0]
+ \item[StartPosition] Mean position of the beam on the Start detector
+ \item[StartPositionRMS] Width of the beam in all four parts of the Start detector
+ \item[StartRateNumbers] Rates from all TDC channels of the Start detector, with numbers in the
+plot
+ \item[StartRateSimple] Rates from all TDC channels of the Start detector
+ \item[StartRate*histbar] Rates from the Start detector, separate for X and Y direction
+ \item[StartSpillShapeAnalysis*\_0] Analysis of the spill shape and regularity based on X or Y
+part of Start detector
\item[StsRate] STS rate for each channel
\item[StsRateSplit] STS for each channel, separated in STS-1 and STS-2
\item[TDCErrors] TDC Error numbers
In the case that the power cycle triggered the temperature interlock for RICH power supplies.
The 3.3V supply might be blocked by the temperature interlock - restart DAQ, then try to reset it.
-\subsection*{Central Controls}
-If a power cycle of the ``Central Controls'' was done, don't forget to ``Reprogram FPGA'' and
+\subsection*{CTS}
+If a power cycle of the CTS was done, don't forget to ``Reprogram FPGA'' and
``BLR Reinit FPGA'' before the DAQ restart.
\subsection*{Other Subdetectors}
\subsection*{Full Powercycle}
A full powercycle should only be done after contact with an expert. Follow the guide for the
-``Daily Powercycle''.
+``Daily DAQ reboot''.
\section{Full Power Cycle / Daily DAQ reboot}