\part{Daily News for the Operator}
-\textbf{2022/02/12 - this page will be updated during the beamtime}
+\textbf{2022/02/19}
\begin{itemize*}
- \item Always keep an eye on the rate plots (``Main Screen 4'' on the web page). If you notice any
-asymmetry between sectors / parts of detectors, try to do a reload of thresholds for the detector
-(do a ``Start Stop DAQ'' before and after to avoid taking corrupted data). If this doesn't help,
-talk to the detector expert, e.g. a power cycle of the frontends might be necessary.
+ \item Always {\bf keep an eye on the rate plots} (``Main Screen 4'' on the web page). If you
+notice any asymmetry between sectors / parts of detectors, try to do a reload of thresholds for the
+detector. If this doesn't help, talk to the detector expert, e.g. a power cycle of the frontends
+might be necessary.
\begin{itemize*}
\item e.g. in ECal a row of 8 green dots appear (-> ECal Padiwa Powercycle)
\item e.g. in TOF one sector has a lower/higher rate (-> Tresholds TOF)
Special attention is needed after a power cycle!
\item After any of the ``Reboot Hubs`` and DAQ restart: If Eventbuilders do not work, do
-a ''Fix missing IP`` and another DAQ restart.
+a ''Fix missing IP`` and (if it prints something apart from 'Done') another DAQ restart.
+
+ \item After a break, {\bf Eventbuilders need some time to recover}. Wait a bit and don't try to
+restart them more than once per minute. Also try to use ''Reset`` from the Web browser EB interface
+for a 'softer' reset.
+
+ \item In most cases a {\bf reboot of a subsystem is the better option} compared to a power cycle.
+If all boards of a subsystem are present, do a reboot, but not a power cycle. Check the missing
+endpoints - {\bf if the boards you want to reboot are missing, it won't work} (apart from MDC).
- \item In most cases a reboot of a subsystem is the better option compared to a power cycle. If
-all boards of a subsystem are present, do a reboot, but not a power cycle. Check the missing
-endpoints - if the boards you want to reboot are missing, it won't work.
-\begin{itemize*}
-\item If you do a reboot of DiRich and Combiners at once: Make a short pause after rebooting
-DiRich, and check there are less than 900 boards missing from RICH. If it's more, do a DAQ restart
-before rebooting Combiners.
-\end{itemize*}
- \item There are a couple of recent issues with MDC DAQ, where power cycles or reboots are not
+ \item There are a couple of recent issues with MDC, where power cycles or reboots are not
necessary:
\begin{itemize*}
-\item If 9 boards including 1033 are missing: Do DAQ restarts until they are back.
\item If 2110 and 2112 are missing after a DAQ restart: Restart again.
\end{itemize*}
-\item If you notice the system to get unstable (frequent restarts), take the time for a full reboot
-/ power cycle together with the expert. This helps a lot to get a stable system again, especially if
-the point of failure can not be identified.
+
+\item Many actions can be done {\bf without a DAQ restart}:
+\begin{itemize*}
+\item All actions from the ''Settings`` column can be done while DAQ is running
+\item ''Reset Thresholds STS`` require you to start/stop trigger before and after.
+\item All ''Powercycle Padiwa`` require you to stop trigger before and load thresholds after.
+\end{itemize*}
\end{itemize*}