\part{Daily News for the Operator}
-\textbf{2022/02/05 - this page will be updated during the beamtime}
+\textbf{2022/02/06 - this page will be updated during the beamtime}
\begin{itemize*}
\item Always keep an eye on the rate plots (``Main Screen 4'' on the web page). If you notice any
asymmetry between sectors / parts of detectors, try to do a reload of thresholds for the detector
\begin{itemize*}
\item e.g. in ECal a row of 8 green dots appear (-> ECal Padiwa Powercycle)
\item e.g. in TOF one sector has a lower/higher rate (-> Tresholds TOF)
+\item e.g. in STS a group of 8 blue channels appear (-> Reset STS Thresholds)
\end{itemize*}
\item Every 1 to 2 hours, when you do a DAQ restart, please do a ``Start Stop Trigger'', ``Reboot
\item After any of the ``Reboot Hubs`` and DAQ restart: If Eventbuilders do not work, do
a ''Fix missing IP`` and another DAQ restart.
- \item There is a ''Trigger`` error every now and then, from a board in RICH (70a7), which also
-causes some ''Evt w/ errors``. This is a known, but no real issue and can be ignored.
+% \item There is a ''Trigger`` error every now and then, from a board in RICH (70a7), which also
+% causes some ''Evt w/ errors``. This is a known, but no real issue and can be ignored.
+
+ \item After any power cycle, pay attention to the rate display from the subsystems. Especially
+ECal and STS likely need some manual action to get proper settings for all front-ends again (see
+first point in this list).
+
\end{itemize*}
\clearpage
This should be performed at least once a day, when there is a break of ~ 15 minutes and in presence
of the DAQ expert: {\bf To be updated for 2022!}
\begin{enumerate}
-\item Switch off beam on control panel
+\item Switch off beam on control panel\\
+ Switch EB to No File
\item MDC power supply group off (EPICS)\\
- Main power supply group power cycle (EPICS)
+ Common Group power supply group power cycle (EPICS)
\item RICH power supply group power cycle (EPICS)
\item ECAL Padiwa Powercycle \\
Hodo Powercycle\\
Start Powercycle \\
- STS Fee \\
+ STS Fee Powercycle\\
iTof Powercycle \\
- Triggerbox Beam \\
+ Triggerbox Beam Powercycle
\item Reprogram FPGA \\
- BLR Reload Settings
+ BLR Reinit FPGA
\item Start DAQ (x2, because of MDC Hubs)
\item Run Fix Missing IP
\item MDC power supply group on (EPICS)