\part{Daily News for the Operator}
-\textbf{2022/02/04 - this page will be updated during the beamtime}
+\textbf{2022/02/05 - this page will be updated during the beamtime}
\begin{itemize*}
\item Always keep an eye on the rate plots (``Main Screen 4'' on the web page). If you notice any
asymmetry between sectors / parts of detectors, try to do a reload of thresholds for the detector
(do a ``Start Stop DAQ'' before and after to avoid taking corrupted data). If this doesn't help,
talk to the detector expert, e.g. a power cycle of the frontends might be necessary.
+\begin{itemize*}
+\item e.g. in ECal a row of 8 green dots appear (-> ECal Padiwa Powercycle)
+\item e.g. in TOF one sector has a lower/higher rate (-> Tresholds TOF)
+\end{itemize*}
\item Every 1 to 2 hours, when you do a DAQ restart, please do a ``Start Stop Trigger'', ``Reboot
DiRich'' and a ``Reboot ECal'' before.
of the DAQ expert: {\bf To be updated for 2022!}
\begin{enumerate}
\item Switch off beam on control panel
-\item MDC power supply group off (EPICS)
+\item MDC power supply group off (EPICS)\\
+ Main power supply group power cycle (EPICS)
+\item RICH power supply group power cycle (EPICS)
\item ECAL Padiwa Powercycle \\
Hodo Powercycle\\
Start Powercycle \\
iTof Powercycle \\
Triggerbox Beam \\
-\item RICH power supply group power cycle (EPICS) \\
- Main power supply group power cycle (EPICS)
+
\item Reprogram FPGA \\
BLR Reload Settings
-\item Start DAQ (x2, because of MDC Hubs)
+\item Start DAQ (x2, because of MDC Hubs)
+\item Run Fix Missing IP
\item MDC power supply group on (EPICS)
MDC LV Turn On All Relais
\item Reboot OEP
\item Start DAQ
-\item Load ECal Thresholds
-\item Check Eventbuilders getting data / all boards have IPs
+\item Thresholds STS Reset\
+ Check Eventbuilders getting data / all boards have IPs
+
\item Switch on beam
\end{enumerate}