daqop_short.txt
epics.tex
main.tex

index bd3add33afff7eef8801dcffe9c371a15f502d86..c53bc17abf5523274c8921af0520b2842266456d 100644 (file)
@@ -2,7 +2,8 @@ What is the starting point?
 --------------------------- 
 
 Open the DAQ-Control GUI (HadesControl Icon), click on "Hmon". A firefox window will
-appear. Click on "Tactical Overview".
+appear. Click on "Tactical Overview". If firefox fails to start from the button, start 
+it manually and direct it to http://hades33/mon
 
 DAQ-Operation:
 --------------
@@ -11,7 +12,9 @@ The main task of the DAQ-Operator is to watch the
 Tactical-Overview window and check that all buttons are green.
 The essential numbers (like trigger rates) have to be in limits
 given by the shift leader.
-The "Operator Guide" offers a description of typical situations during data
+The "Operator Guide" gives further information about each entry in 
+the tactical overview. You can open it by clicking on an entry.
+It also offers a description of typical situations during data
 acquisition. It also contains instructions to solve typical
 problems. Following guides point to relevant chapters if necessary.
 
@@ -26,28 +29,45 @@ DAQ problems. The "HadesControl" Icon starts DAQ-Control.
 describes the use of these buttons. 
 
 "Monitor Tools" contain all observation windows.
-        "CTS Mon": Opens the CTS Monitor.
-        "Hmon": Click on "Tatical Overview" in the new Firefox window to get 
-        "Epics":Opens the Epics Monitor.
-        "Epics FB": Shows a status window containing Eventbuilder
-        information.
-
-"Eventbuilder Tools" are necessary for an Eventbuilder restart. Details are
-described in the "Eventbuilder-Stop" guide.        
-
-
-
+        - "CTS Mon": Opens the CTS Monitor.
+        - "Hmon": Click on "Tatical Overview" in the new Firefox window to get the mains screen.
+          If firefox fails to start from the button, start it manually 
+          and direct it to http://hades33/mon
+        - "Epics":Opens the Epics Monitor.
+        - "Epics FB": Shows a status window containing Eventbuilder
+          information.
+        - "Daq VNC" Opens the VNC window for DAQ control used during preparation
+        - "Chat" The DAQ users chat window
+
+        
+"Eventbuilder Tools" are necessary for the control of Eventbuilders.
+  - "Stop EB" stops all EB. 
+  - "Restart EB" starts the EB with the last settings again
+  - "Prefix XX" restarts the EB and sets the file prefix to a new one
+
+"Expert Tools"
+  - "CTS Scope" Opens the window oscilloscope connected to the CTS for
+    signal adjustment
+  - "Reload RPC Thresholds" Loads the settings for trigger boards of RPC
+    in case the count rates on the CTS monitor are wrong
+  - "Restart EB IOC" If some of the entries in the Epics Eventbuilder Monitor
+    are white, use this button to restart them
+  - "Restart Hmon" Restarts the browser-based monitoring tools
+  - "Start / Stop Speech Output" Temporarily stops the speech output for errors
+  
 
 Eventbuilder-Stop:
 ------------------
 
 In the case of beam breaks etc. the shift leader decides to
 change the mode of data taking or even stop data taking (DAQ
-system is still running).
+system is still running - in general, writing test files is better
+than stopping EB!). 
 
 1. ) Stop the data taking press the "StopEB" button in the "DAQ
 Control" window.  In the tactical overview the first button in
 the row "EB" the text will change from EB-running to EB-stopped.
+Note that it is not necessary to stop before restarting or loading a new prefix.
 
 2.) To restart the EB with the current prefix, click on "Restart
 EB" in the DAQ-Control
@@ -56,31 +76,41 @@ EB" in the DAQ-Control
 buttons "Prefix ...". N.B., that the "Prefix NoFile" button
 starts the event builder in dummy mode, i.e. no file is written.
 
+
+
 DAQ-Restart:
 ------------
 
+
 In the case the DAQ is not working correctly, the DAQ has to be
 restarted. DAQ-Control provides the necessary operations for
 a DAQ restart.
 
-1) Press "Start DAQ" to restart DAQ. An orange window appears and
+1) Press "Start DAQ" to restart DAQ. An orange window appears and
 should disappear after 30s-40s if the restart was successful.
 An unsuccessful attempt is indicated by an error message in
 the orange window. Try a second DAQ restart, if the first
 one failed.
 
-2) In the case of an unsuccessful DAQ restart a MDC Power Cycle 
+2) In the case of an unsuccessful DAQ restart a MDC Power Cycle 
 has to be performed. The steps of a MDC Power Cycle are described
 in the Operator Guide Chapter 34.2. After this operation the DAQ
-has to be restarted. Follow the instructions given in step "1)".
+has to be restarted. Follow the instructions given in step "1)".
 
-3. ) In the Case "2. )" failed, the "RebootMDCHub" icon should be used.
-After pressing "RebootMDCHub" the DAQ has to be restarted which is described in
-"1. )".
+3) In the Case "2)" failed, the "RebootMDCHub" icon should be used.
+After pressing "RebootMDCHub" and waiting 30 seconds, the DAQ has to be 
+restarted which is described in "1)".
 
-4. ) In the case step "3. )" was not successful, a "Full Power Cycle" has to be
+4) In the case step "3)" was not successful, a "Full Power Cycle" has to be
 performed. This procedure is described  in the "Operator Guide Chapter 33.1"
-Restart DAQ following the steps in "1.)" .
+Restart DAQ following the steps in "1)" .
+
+5) The DAQ expert has to be called if the DAQ is still not working. 
+
+
+
+
 
-5. ) The DAQ expert has to be called if the DAQ is still not working. 
+All DAQ-Control Tools will open a orange window with their output which disappears
+after they finished. Make sure that no two orange windows are open at the same time.
  
index e88a4e0f725b95044023e9a90d8eafc6b7d7c754..2ac10e6e3796f9d2bfe40a063c16527b45294f91 100644 (file)
--- a/epics.tex
+++ b/epics.tex
@@ -37,5 +37,41 @@ dbl  ==> gives you list of PVs.
 then
 quit
 
+\end{verbatim} 
+
+\subsection{DreamPlug}
+
+In the case of a failure of the DreamPlug, please reboot several times.
+If this is not successful, then attach then please attach the 
+``GuruPlug JTAG board'', only the smaller connector (``UART'').
+Then you can start on a laptop 
+
+
+
+\begin{verbatim}
+
+picocom -b 115200 /dev/ttyUSB0
+(picocom: exit via: ctrl-a + ctrl-x
+
+# to boot from the internal SD-card
+setenv x_bootcmd_kernel fatload usb 0 0x6400000 uImage                     
+setenv x_bootargs_root root=/dev/sda2 rootdelay=10                         
+saveenv
+reset
+
+# to set the device to boot from an external USB-stick
+setenv x_bootcmd_kernel fatload usb 2 0x6400000 uImage_2.6.33.7 
+setenv x_bootargs_root root=/dev/sdc2 rootdelay=10
+saveenv
+reset
+
+
+#USB stick root password: nosoup4u
+
+# if everything fails:
+# overwrite the internal SD-card with an image (the one on the stick)
+gzip -cdv /backup_ee_dev007_sda.raw.gz | dd of=/dev/sda bs=1M
+
 
 \end{verbatim} 
+
index 2c23c2388c7e1bc0bbeb16142c4510b9a091be2e..2300557e5b366a6ec3f430afcacd6fe909c923b3 100755 (executable)
--- a/main.tex
+++ b/main.tex
@@ -52,7 +52,8 @@
 
 \title{A Users Guide\\to the\\HADES DAQ System}
 \date{\today ~-~\thistime}
-\author{Jan Michel, J\"orn Adamczewski-Musch, Michael B\"ohmer, Grzegorz Korcyl, \\Marek Palka, Sergey Yurevich}
+\author{Jan Michel, J\"orn Adamczewski-Musch, Michael B\"ohmer, Grzegorz
+  Korcyl, \\Marek Palka, Sergey Yurevich, Michael Traxler}
 
 
 \newcommand{\filename}[1]{\textit{#1}}